Fig. 6From: Superstructure-based process synthesis and economic assessment under uncertainty for solid drug product manufacturingWhat-if analysis in Scenario 1 with varying the manufacturing rate from the original (left) to 19 kg h− 1 (middle) and to 15 kg h− 1 (right)Back to article page